{"source":{"wind":{"source":"DESNZ Energy Trends table 6.1 (capacity); The Crown Estate and Crown Estate Scotland lease areas (sites)","url":"https://www.gov.uk/government/statistics/energy-trends-section-6-renewables","licence":"Open Government Licence v3.0 (DESNZ, Crown Estate Scotland); TCE Open Data Licence (GIS) v1.1 (The Crown Estate)","licenceUrl":"https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/","status":"open","credit":"Contains public sector information licensed under the Open Government Licence v3.0. Contains data provided by The Crown Estate."},"tidal":{"source":"Brent & Beyond compilation from Orbital Marine Power, EMEC and euro-tides.eu (cited facts, links per site)","url":"https://www.emec.org.uk/","licence":"Facts compiled by this site with per-site source links; check each source before reuse","licenceUrl":"https://www.brentandbeyond.com/data/","status":"flagged","credit":"Compiled by Brent & Beyond from the linked sources."}},"wind_capacity":{"source":"DESNZ Energy Trends table 6.1 (published 29 Sep 2026), OGL v3.0","unit":"MW, end of quarter, UK offshore wind (seabed + floating)","quarters":["2010Q1","2010Q2","2010Q3","2010Q4","2011Q1","2011Q2","2011Q3","2011Q4","2012Q1","2012Q2","2012Q3","2012Q4","2013Q1","2013Q2","2013Q3","2013Q4","2014Q1","2014Q2","2014Q3","2014Q4","2015Q1","2015Q2","2015Q3","2015Q4","2016Q1","2016Q2","2016Q3","2016Q4","2017Q1","2017Q2","2017Q3","2017Q4","2018Q1","2018Q2","2018Q3","2018Q4","2019Q1","2019Q2","2019Q3","2019Q4","2020Q1","2020Q2","2020Q3","2020Q4","2021Q1","2021Q2","2021Q3","2021Q4","2022Q1","2022Q2","2022Q3","2022Q4","2023Q1","2023Q2","2023Q3","2023Q4","2024Q1","2024Q2","2024Q3","2024Q4","2025Q1","2025Q2","2025Q3","2025Q4","2026Q1","2026Q2"],"mw":[951,1041,1341,1341,1427,1564,1650,1838,2200,2516,2682,2995,3381,3543,3656,3696,3764,4085,4426,4501,4738.6,5014,5093.5,5093.5,5087.1,5087.1,5087.1,5293.4,5447.9,5645.8,6130.8,6987.9,7639.9,7793.9,8009.7,8180.5,8479.3,9156.3,9702.3,9888.3,10382.9,10382.9,10382.9,10382.9,10392.4,10665.4,11066.9,11255.5,12617.5,12616.5,12616.5,13847.5,14734.7,14734.7,14734.7,14734.7,14809.7,15691.7,15691.7,16139.7,16314.7,16649.7,16649.7,16649.7,16732.7,16732.7]},"wind_sites":[{"name":"Robin Rigg East","tenant":"RWE Renewables UK","status":"Operational","capacity_mw":84,"lease":"Lease Marine","source":"ces"},{"name":"Robin Rigg West","tenant":"RWE Renewables UK","status":"Operational","capacity_mw":90,"lease":"Lease Marine","source":"ces"},{"name":"Methil Demo","tenant":"ORE Catapult Ltd","status":"Operational","capacity_mw":7,"lease":"Lease Marine","source":"ces"},{"name":"Forthwind","tenant":"Forthwind Ltd","status":"Consented","capacity_mw":12,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Beatrice Offshore Wind Farm","tenant":"Beatrice Offshore Wind Farm","status":"Operational","capacity_mw":588,"lease":"Lease Marine","source":"ces"},{"name":"Aberdeen Offshore Wind Farm","tenant":"Aberdeen Offshore WindFarm Ltd","status":"Operational","capacity_mw":97,"lease":"Lease Marine","source":"ces"},{"name":"Buchan Deep Demo","tenant":"Hywind (Scotland) Ltd","status":"Operational","capacity_mw":30,"lease":"Lease Marine","source":"ces"},{"name":"Pentland Floating Offshore WF","tenant":"Highland Wind Ltd","status":"Consented","capacity_mw":100,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Kincardine","tenant":"Kincardine Offshore WF Ltd","status":"Operational","capacity_mw":50,"lease":"Lease Marine","source":"ces"},{"name":"Moray Offshore Windfarm (East)","tenant":"Moray Offshore Wind Farm","status":"Operational","capacity_mw":953,"lease":"Lease Marine","source":"ces"},{"name":"Berwick Bank Wind Farm","tenant":"Berwick Bank Wind Farm Limited","status":"Consented","capacity_mw":4100,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Neart na Gaoithe Offshore WF","tenant":"Neart Na Gaoithe Offshore Wind","status":"Operational","capacity_mw":448,"lease":"Lease Marine","source":"ces"},{"name":"Bowdun Offshore Wind Farm","tenant":"Bowdun Offshore Wind Farm","status":"In Planning","capacity_mw":1008,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Ossian Offshore Wind Farm","tenant":"Ossian Offshore Windfarm","status":"In Planning","capacity_mw":3528,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Buchan Offshore Wind Farm","tenant":"Buchan Offshore Wind Limited","status":"In Planning","capacity_mw":960,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Stromar","tenant":"Stromar Offshore Wind Farm","status":"Pre Planning","capacity_mw":1500,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Broadshore","tenant":"Broadshore Offshore Wind Farm","status":"Pre Planning","capacity_mw":900,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Bellrock","tenant":"Bellrock Offshore Wind Farm","status":"In Planning","capacity_mw":1200,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"MarramWind","tenant":"MarramWind Limited","status":"In Planning","capacity_mw":3000,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"MachairWind","tenant":"MachairWind Limited","status":"In Planning","capacity_mw":2000,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Ayre Offshore Wind Farm","tenant":"Ayre Offshore Wind Farm","status":"In Planning","capacity_mw":1008,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Spiorad na Mara","tenant":"Spiorad Na Mara Limited","status":"In Planning","capacity_mw":900,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Talisk Offshore Wind Project","tenant":"Magnora Offshore Wind N3 Ltd","status":"Pre Planning","capacity_mw":495,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Muir Mhor","tenant":"Muir Mhor Offshore Wind Farm","status":"In Planning","capacity_mw":1000,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Havbredey","tenant":"Havbredey Limited","status":"Pre Planning","capacity_mw":1500,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"West of Orkney Wind Farm","tenant":"Offshore Wind Power Limited","status":"Consented","capacity_mw":2000,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Caledonia Offshore Wind Farm","tenant":"Caledonia Offshore Wind Farm","status":"Consented","capacity_mw":2000,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Stoura Offshore Wind Farm","tenant":"Shetland Offshore Wind Ltd","status":"Pre Planning","capacity_mw":500,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Arven South","tenant":"Arven South Limited","status":"Pre Planning","capacity_mw":500,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Moray West","tenant":"Moray Offshore Windfarm (West)","status":"Operational","capacity_mw":882,"lease":"Lease Marine","source":"ces"},{"name":"Morven","tenant":"Morven Offshore Wind Limited","status":"In Planning","capacity_mw":2907,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Arven Offshore Wind Farm","tenant":"Arven Offshore Wind Farm","status":"Pre Planning","capacity_mw":1800,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Sinclair","tenant":"Sinclair Offshore Wind Farm","status":"Pre Planning","capacity_mw":100,"lease":"Exclusivity Agreement","source":"ces"},{"name":"Scaraben","tenant":"Scaraben Offshore Wind Farm","status":"Pre Planning","capacity_mw":100,"lease":"Exclusivity Agreement","source":"ces"},{"name":"Flora","tenant":"Jera Nex BP North East Limited","status":"Pre Planning","capacity_mw":50,"lease":"Exclusivity Agreement","source":"ces"},{"name":"Malin","tenant":"Malin Sea Wind Limited","status":"Pre Planning","capacity_mw":96,"lease":"Exclusivity Agreement","source":"ces"},{"name":"Judy","tenant":"Chrysaor Petroleum Company U.K","status":"Pre Planning","capacity_mw":15,"lease":"Exclusivity Agreement","source":"ces"},{"name":"Cenos","tenant":"Cenos Offshore Windfarm","status":"In Planning","capacity_mw":1350,"lease":"Exclusivity Agreement","source":"ces"},{"name":"Cedar","tenant":"Cerulean Winds Cedar Project","status":"Pre Planning","capacity_mw":1008,"lease":"Exclusivity Agreement","source":"ces"},{"name":"Beech","tenant":"Cerulean Winds Beech Project","status":"Pre Planning","capacity_mw":1008,"lease":"Exclusivity Agreement","source":"ces"},{"name":"Aspen","tenant":"Cerulean Winds Aspen Project","status":"In Planning","capacity_mw":1008,"lease":"Exclusivity Agreement","source":"ces"},{"name":"Green Volt","tenant":"Green Volt Offshore Windfarm","status":"Consented","capacity_mw":560,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Seagreen Phase 1 Windfarm","tenant":"Seagreen Wind Energy Limited","status":"Operational","capacity_mw":1075,"lease":"Lease Marine","source":"ces"},{"name":"Seagreen 1A Offshore Wind Farm","tenant":"Seagreen 1A Limited","status":"Consented","capacity_mw":500,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Inch Cape Offshore Wind Farm","tenant":"Inch Cape Offshore Ltd","status":"Under Construction","capacity_mw":1080,"lease":"Lease Marine","source":"ces"},{"name":"Salamander","tenant":"Salamander Wind Project","status":"Consented","capacity_mw":100,"lease":"Agreement/Option for Lease","source":"ces"},{"name":"Culzean","tenant":"TotalEnergies E&P North Sea UK","status":"Under Construction","capacity_mw":3,"lease":"Lease Marine","source":"ces"},{"name":"Walney 2","tenant":"Walney (UK) Offshore Windfarms Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Walney 1","tenant":"Walney (UK) Offshore Windfarms Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"West of Duddon Sands","tenant":"ScottishPower Renewables (WoDS) Limited and Orsted West of Duddon Sands (UK) Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Barrow","tenant":"Barrow Offshore Wind Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Ormonde","tenant":"Ormonde Energy Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Rhyl Flats","tenant":"Rhyl Flats Wind Farm Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Gwynt y Mor","tenant":"Gwynt y Mor Offshore Wind Farm Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Burbo Bank Extension","tenant":"Orsted Burbo Extension (UK) Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Burbo Bank","tenant":"Orsted Burbo (UK) Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Gunfleet Sands I","tenant":"Gunfleet Sands Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Gunfleet Sands II","tenant":"Gunfleet Sands II Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Gunfleet Sands Demo","tenant":"Gunfleet Sands Demo Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Kentish Flats","tenant":"Kentish Flats Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Kentish Flats Extension","tenant":"Vattenfall Wind Power Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"London Array","tenant":"London Array Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Thanet","tenant":"Thanet Offshore Wind Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Greater Gabbard","tenant":"Greater Gabbard Offshore Wind Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Scroby Sands","tenant":"RWE Renewables UK Scroby Sands Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Sheringham Shoal","tenant":"SCIRA Offshore Energy Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Lincs","tenant":"Lincs Wind Farm Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Dudgeon","tenant":"Dudgeon Offshore Wind Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Race Bank","tenant":"Race Bank Wind Farm Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Humber Gateway","tenant":"RWE Renewables UK Humber Wind Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Westermost Rough","tenant":"Westermost Rough Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Lynn","tenant":"Lynn Wind Farm Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Inner Dowsing","tenant":"Inner Dowsing Wind Farm Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Teesside","tenant":"Teesside Windfarm Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Galloper","tenant":"Galloper Wind Farm Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Rampion","tenant":"Rampion Offshore Wind Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Walney Extension 3","tenant":"Walney Extension Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Walney Extension 4","tenant":"Walney Extension Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Dogger Bank C","tenant":"Doggerbank Offshore Wind Farm Project 3 Projco Limited","status":"Under Construction","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Sofia","tenant":"Sofia Offshore Wind Farm Limited","status":"Under Construction","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Dogger Bank A","tenant":"Doggerbank Offshore Wind Farm Project 1 Projco Limited","status":"Under Construction","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Dogger Bank B","tenant":"Doggerbank Offshore Wind Farm Project 2 Projco Limited","status":"Under Construction","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Hornsea 1 (East)","tenant":"Hornsea 1 Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Hornsea 1 (West)","tenant":"Hornsea 1 Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Hornsea 1 (Centre)","tenant":"Hornsea 1 Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"East Anglia ONE","tenant":"East Anglia One Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Triton Knoll","tenant":"Triton Knoll Offshore Wind Farm Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Blyth Demo Phase 1","tenant":"Blyth Offshore Demonstrator Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Hornsea Project 2 - Phase 2 (Soundmark)","tenant":"Soundmark Wind Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Hornsea Project 2 - Phase 3 (Sonningmay)","tenant":"Sonningmay Wind Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"North Hoyle","tenant":"North Hoyle Wind Farm Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Dudgeon Extension","tenant":"Dudgeon Extension Limited","status":"In Planning","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Awel y Mor","tenant":"Awel y Mor Offshore Wind Farm Limited","status":"Consented","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Erebus Floating Wind Demo","tenant":"Blue Gem Wind Limited","status":"Consented","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Five Estuaries","tenant":"Five Estuaries Offshore Wind Farm Limited","status":"Pre Planning","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Sheringham Shoal Extension","tenant":"SCIRA Extension Limited","status":"In Planning","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"North Falls","tenant":"North Falls Offshore Wind Farm Limited","status":"Pre Planning","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Rampion 2 (Rampion Extension)","tenant":"Rampion Extension Development Limited","status":"In Planning","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Rampion 2 (Zone 6)","tenant":"Rampion Extension Development Limited","status":"In Planning","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"R4 Project 1 (Dogger Bank South West)","tenant":"RWE Renewables","status":"Consented (CfD awarded)","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"R4 Project 2 (Dogger Bank South East)","tenant":"RWE Renewables","status":"Consented (CfD awarded)","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"R4 Project 3 (Outer Dowsing)","tenant":"GT R4 Limited","status":"Consented","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"R4 Project 6 (Morgan)","tenant":"Morgan Offshore Wind Limited","status":"Consented","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Morlion (formerly Wave Hub)","tenant":"Morlion Limited","status":"Consented","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Hornsea Project 2 - Phase 1 (Breesea)","tenant":"Breesea Limited","status":"Operational","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"White Cross","tenant":"Offshore Wind Limited","status":"Consented","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Round 5 PDA 1 Gwynt Glas","tenant":"Gwynt Glas Offshore Wind Farm Limited","status":"Pre Planning","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Round 5 PDA 3","tenant":"Equinor Celtic Sea PDA3 Limited","status":"Pre Planning","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"Hornsea Project 3 (HOW03)","tenant":"Orsted Hornsea Project Three (UK) Limited","status":"Under Construction","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"East Anglia ONE North","tenant":"East Anglia One North Limited","status":"Consented","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"East Anglia TWO","tenant":"East Anglia Two Limited","status":"Consented (CfD awarded)","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Norfolk Boreas","tenant":"Norfolk Boreas Limited","status":"Consented","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Norfolk Vanguard East","tenant":"Norfolk Vanguard East Limited","status":"Consented (CfD awarded)","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Norfolk Vanguard West","tenant":"Norfolk Vanguard West Limited","status":"Consented (CfD awarded)","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Morecambe","tenant":"Morecambe Offshore Windfarm Ltd","status":"Consented","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Mona","tenant":"Mona Offshore Wind Limited","status":"Consented","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Round 5 PDA 2 (Ocean Winds)","tenant":"Celtic Sea Offshore Wind Farm Limited","status":"Pre Planning","capacity_mw":null,"lease":"Agreement / Option for Lease","source":"tce"},{"name":"East Anglia THREE","tenant":"East Anglia Three Limited","status":"Under Construction","capacity_mw":null,"lease":"Lease - Marine","source":"tce"},{"name":"Hornsea 4","tenant":"Ørsted Hornsea Project Four Limited","status":"Consented","capacity_mw":null,"lease":"Lease - Marine","source":"tce"}],"tidal_sites":[{"id":"orbital-o2","name":"Orbital O2 (EMEC Fall of Warness)","kind":"tidal_device","status":"Operational","capacityMw":2,"facts":["2 MW floating tidal turbine: twin 1 MW nacelles, 74 m hull","Grid-connected at EMEC Fall of Warness, Eday, Orkney since July 2021","Rated to meet demand of ~2,000 UK homes","Metered output is not public (EMEC keeps device metering confidential)"],"milestones":[["2021-04","O2 launched (Dundee) and towed to Orkney"],["2021-07","Grid connection at EMEC Fall of Warness"],["2026-10","Becomes part of EURO-TIDES array (4 turbines)"]],"sources":["https://www.orbitalmarine.com/o2-power-generation/","https://www.emec.org.uk/about-us/our-tidal-clients/orbital-marine-power/"],"lon":-2.81,"lat":59.145},{"id":"euro-tides","name":"EURO-TIDES array (planned)","kind":"tidal_array","status":"Approved – target 2028","capacityMw":null,"facts":["4 turbines: 3 × Orbital O2-X plus the existing O2","Deployment targeted for 2028, subject to completion of Orbital's current investment round (Orbital, 12 Oct 2026)","~9,200 homes equivalent (~2,400 per O2-X), roughly 85% of Orkney households","Note: euro-tides.eu still states deployment 'by 2027' – Orbital's newer 2028 date shown"],"milestones":[["2026-10","European Commission 'Go Decision' (Orbital release 12 Oct 2026)"],["2028","Target deployment of 3 × O2-X (subject to funding)"]],"sources":["https://www.orbitalmarine.com/european-commission-approval-for-landmark-tidal-energy-array/","https://www.euro-tides.eu/overview"],"lon":-2.795,"lat":59.16},{"id":"meygen","name":"MeyGen (Inner Sound, Pentland Firth)","kind":"tidal_array","status":"Operational","capacityMw":398,"facts":["Crown Estate Scotland lease: MeyGen PLC, Inner Sound, 398 MW leased capacity, phase 'Operational'","Leased capacity is the lease envelope, not installed capacity","Metered output is not in public per-site data used here"],"milestones":[],"sources":["Crown Estate Scotland Tidal layer (OGL v3)"],"lon":-3.135,"lat":58.66}]}